Home > About > DuraFlo Solution


ACE DuraFlo® 3-Step Process

  1. PIPES ARE HEATED & AIR DRIED
    Air hoses are connected to the piping system. The isolated system is then dried with preheated, filtered air.

  2. BURST SANDED REMOVING CORROSION
    The dried pipes are cleaned using an air and sand mixture that sandblasts the inside surface of the pipes. The cleaning process prepares the internal pipe surface for proper bonding of the epoxy.

  3. EPOXY COATING APPLIED
    The final stage of the ePIPE process is the application of the epoxy lining to the system. This seals and protects the piping system from future corrosion.

Process Diagram
the e-pipe process